Lane and Shoulder Closures

Intermittent Lane Closures: Pre-construction work for geotechnical boring requires outside lane and shoulder closures next week. The scheduled closures are:

Date / Time
Location Closures
Monday, Aug. 28 – Thursday, Aug. 31
9 a.m. to 3 p.m.
Eastbound SR-91
/Northbound I-15
Connector lane from Eastbound SR-91 to Northbound I-15
Monday, Aug. 28 – Thursday, Aug. 31
9 a.m. to 3 p.m
Northbound I-15 From SR-91 to Hidden Valley Parkway outside lane closure
Wednesday, Aug. 30- Thursday, Aug. 31
6 a.m. to 3 p.m.
Westbound SR-91 Westbound SR-91 at I-15 shoulder closure only
Wednesday, Aug. 30- Thursday, Aug. 31
6 a.m. to 3 p.m.
Eastbound SR-91 Eastbound SR-91 at I-15 shoulder closure only

Motorists will still be able to travel the I-15 but should remain alert for the safety of construction crews.


School’s Open – Drive Carefully: According to the National Highway Safety Administration, traffic accidents that involve pedestrians are most likely to occur between the hours of 6-9 am and 3-6 pm, the hours when students are traveling to and from school. Motorists should follow these safe-driving tips for school zone safety:

  • Slow down and obey all traffic laws and speed limits
  • Focus 100% on the road
  • Comply with school drop-off and pick-up procedures
  • Stop for school buses when overhead lights are flashing
  • Watch for children walking or bicycling

Being a little extra cautious is worth it for the safety of children


Project Work: Surveying crews will continue working throughout the project limits on shoulders, under bridges and around on-and-off ramps. This work is required to verify locations of existing underground utilities and physical properties which could affect elements of the project design.

 