Intermittent Lance Closures

Intermittent Lane Closures: Pre-construction work requires nighttime and daytime lane closures on the I-15. The scheduled closures are:

Date / Time
Location Closures
Thursday, Aug. 17
8 p.m. to 5 a.m
Northbound I-15 Magnolia Ave. to SR-91
Thursday, Aug. 17
7:30 p.m. to 4 a.m.
Westbound SR- 91 Magnolia Ave. to I-15 bridge overcrossing*
Friday, Aug. 18
8 p.m. to 5 a.m.
Northbound I-15 Magnolia Ave. to SR-91
Sunday, Aug. 20
9 p.m. to 5 a.m.
Southbound I-15 SR-91 to Magnolia Ave.
Sunday, Aug. 20
9 p.m. to 5 a.m.
Westbound SR- 91 Westbound SR-91 to Southbound I-15 connector shoulder*
Tuesday, Aug. 22 – Thursday, Aug. 24
9 a.m. to 3 p.m. daily
Southbound I-15 El Cerrito Road to Cajalco Road

*Please be advised that the 91 Express Lanes will remain open and accessible while this work is taking place. 

Motorists will still be able to travel the I-15 but should remain alert for the safety of construction crews.


I-15 Bridge Work over Santa Ana River: Construction crews are performing soil testing underneath the bridge, requiring use of a boring rig that will drill holes at various locations underneath the bridge to gather soil samples. The work is taking place 7 a.m. to 5 p.m. weekdays and is expected to last through September. The work is necessary to accommodate the future widening of the bridge, as part of the I-15 Express Lanes Project. Some noise is expected, but it will not exceed levels permitted by local, state, and federal regulations.

Project Work: Surveying and underground utility locator crews will continue working throughout the project limits on shoulders, under bridges and around on-and-off ramps. This work is required to verify locations of existing underground utilities and physical properties which could affect elements of the project design.

 